December 29, 2008

December 2008

Cabinets and doors are in! We are putting the finishing touches on the kitchen office.

In the master suite, we have finished all of the stone, granite and tile; hidden below the travertine floor is in-floor radiant heat to warm your feet on winter mornings.

One of my favorite features is the entryway fireplace which greets you as you pass through the front door.

Finally, check out that view of frozen Shadow Mountain Lake from the master suite balcony!






November 21, 2008

November 2008

The wire-brushed alder floors have been sanded, sealed and stained and they look beautiful! The masons have been working diligently at laying the stone around the three fireplaces. The standing seam metal roofing has been installed on all the lower roofs, which really makes this house stand out from the crowd.




October 17, 2008

October 2008

This month the house started to show some of its unique features. All of the closets have been built out with ample shelving. Many other built-in features are located throughout the house. We found an amazing tree w/ a split trunk to accent the log staircase. The tile installers began laying the slate floors in key locations in the house. Another nice feature of this home is that none of the HVAC equipment is in the crawlspace. Conveniently it is placed in a utility room off the 3-car garage.







September 29, 2008

September 2008

We were really moving this month! The electrical is in. Four inch mini-cans are positioned throughout the home for ample lighting. The drywall is complete on the first floor. The closed-cell foam and fiberglass insulation has been installed. It's very impressive stuff and necessary for those snowy Grand Lake winters!

As you can see, the exterior of the house has an artful blend of cedar shingles, board and batten, and lap siding.
The master balcony has been built in a timber frame style and looks very impressive.





















August 31, 2008

Roof Raising Party

The Roof Raising Party is a Grand Lake Land / Bighorn Building Services tradition. The party is a big hit with all the construction crews and suppliers involved with the project. We celebrated the roof going on with a BBQ, and the weather held out long enough to make it a good time for our hardworking team.




August 26, 2008

August 2008

The windows in the master suite have been framed... what an incredible view! The log stair has been crafted from native timbers by local craftsmen! Custom garage doors add a handsome look to the front of this home. Work on the interior has begun, including installing the living room fireplace.






July 20, 2008

July 2008

Made a lot of progress this month! The foundation was laid, framing is underway, and the first trusses were put in place.


You can't tell from the pictures, but the exterior of this home is built completely out of 2x8 wall construction which provides room for superior insulation.






June 15, 2008

June 2008

Site clearing and surveying began on Shadow Lake Villas, Lot 4 in early June. The guys were pretty happy to spend the summer working on Shadow Mountain Lake!

As you can see, this home is built on steel piers combined with a french drain system which provides a better foundation for lakefront construction.